
Open the Bill of Lading Generator
Example numbers from the Bill of Lading Generator. Open it to use your own.
A bill of lading (BOL) is the receipt for the freight: what was picked up, from whom, and who gets it. To make one, list the consignor and consignee, the origin and destination, the number of packages, a description of the freight and its weight where that sets the rate (49 CFR 373.101), or build one in the free bill of lading generator.
Need to make one now? Use the free bill of lading generator.
What the rules say has to be on it
Under 49 CFR 373.101, every for-hire motor carrier covered by that part has to issue a receipt or bill of lading for property it takes for transportation in interstate or foreign commerce. It must contain:
- The names of the consignor (shipper) and consignee (receiver)
- The origin and destination points
- The number of packages
- A description of the freight
- The weight, volume, or measurement of the freight, if that's used to rate it
The same section says the carrier has to keep a record of this information as prescribed in 49 CFR Part 379. Part 379's schedule lists copies of bills of lading at one year (Appendix A to Part 379).
In practice the shipper almost always hands you their own BOL. That's fine, since it's still your receipt. Your job is to check it before you sign. The bill of lading generator is for when there isn't one, such as a small shipper, a farm pickup, or a direct customer who expects you to bring the paperwork.
Two more things from the statute are worth knowing. The carrier's liability for loss or damage runs to whoever is entitled to recover under the receipt or bill of lading, and failing to issue one doesn't get a carrier out of that liability (49 U.S.C. 14706(a)(1)). And a straight bill of lading, one that says the goods go to a named consignee, is nonnegotiable (49 U.S.C. 80103(b)). That's the kind nearly all truck freight moves on.
The rest of the form
Beyond the required items, a working BOL usually carries:
- BOL number and ship date, plus pickup, PO, or order numbers the receiver will look for.
- Carrier name, and your SCAC, MC, or USDOT number if the shipper asks for them.
- Trailer and seal numbers. Write the seal number on the BOL at pickup and check it again at delivery.
- Freight charge terms: prepaid (the shipper pays), collect (the consignee pays), or third party (someone else, often the broker, gets the bill, and their name and address go on the BOL).
- Commodity lines: handling units (pallets, skids), package count and type, weight, description, and for LTL, the NMFC item number and freight class.
- Signatures: shipper, driver, and receiver, each with a date.
Worked example
You pick up at a food plant in Fresno, CA going to a grocery DC in Reno, NV. The BOL shows two lines:
- 20 pallets, 1,120 cases of canned tomatoes, 36,800 lb
- 2 pallets, 96 cases of canned beans, 2,150 lb
The totals row should be:
- Handling units: 20 + 2 = 22 pallets
- Packages: 1,120 + 96 = 1,216 cases
- Weight: 36,800 + 2,150 = 38,950 lb
Now check it against the trailer. You count 22 pallets. Good. You can't count 1,216 cases on shrink-wrapped pallets, and if the shipper loaded the trailer and sealed it before you got a look, you can't count anything. Many drivers write "shipper load and count" (SLC) and the seal number on the BOL in that situation, so the record shows you didn't verify the piece count yourself. If you scale the load, compare the scale ticket with the 38,950 lb on paper before you leave.
At delivery
- Check the seal number against the BOL before the receiver cuts it.
- If anything is short, damaged, or refused, write it on the BOL before anyone signs: "2 cases crushed, line 1" or "1 pallet refused, wrong item." A BOL signed with no exceptions says the freight arrived in good order.
- Get the receiver's printed name, signature, and the date and time.
- Scan it before you leave the dock. That signed copy is your proof of delivery.
Hazmat is different
If any of the freight is a hazardous material, the BOL is also a hazmat shipping paper and has to meet 49 CFR Part 172, Subpart C. Among other things, 172.201(a)(1) says hazmat entries must be listed first, printed in a contrasting color, or marked with an "X" in a column headed "HM." Section 172.202 sets the basic description (identification number, proper shipping name, hazard class, and packing group, in that order). Section 172.201(d) requires an emergency response phone number, and 172.204 requires the shipper's certification. The shipper is responsible for that description. If it looks wrong or is missing, don't take the load until it's fixed. Our generator marks hazmat lines and prints the phone number and certification, but it doesn't check the description.
Using a carrier's own bill of lading (R+L, Estes, Old Dominion and others)
Most LTL carriers will take a standard straight bill of lading, but many shippers use the carrier's own form or create the BOL on the carrier's website so the pickup request and the BOL match. If your shipper or broker says "use the R+L BOL," that's what they mean.
Where to find it: log in or go to the shipping tools section of the carrier's site and look for "Create BOL" or "Bill of Lading." Fill in the same fields as any BOL: shipper and consignee, pieces, weight, freight class (LTL), NMFC number if you have it, special instructions and the PO or reference numbers the receiver needs.
Running your own truck on a truckload or partial? You can use any standard BOL, including our free bill of lading generator. Just make sure the piece count and weight on the BOL match what you actually loaded before you sign.
Carrier pages (we are not affiliated with these carriers):
- R+L Carriers: Bill of Lading (BOL)
- Estes Express Lines: My Estes Bill of Lading
- Old Dominion Freight Line: Schedule a Pickup and bill of lading tools
Where the BOL goes next
The signed BOL goes out with your invoice. The freight invoice generator has a BOL number field so the broker can match them. If you paid a lumper at delivery, add the lumper receipt to the same packet.
Bill of lading basics: what it is, who signs, and what to check
A bill of lading (BOL) is the receipt for the freight: what the driver picked up, from whom, and who gets it. The rate confirmation is the price deal between you and the broker. The BOL is the paper proof of what moved and who signed for it.
Last updated: October 19, 2026
Haul Math is a free set of trucking calculators for owner-operators and small fleets, run by Hive Asset Group, LLC.
This is general information with sources, not legal advice. Check the official source for your situation.
BOL vs rate confirmation
People mix these up. They do different jobs.
| Item | Rate confirmation | Bill of lading |
|---|---|---|
| Who makes it | The broker or carrier you haul for | Usually the shipper |
| What it says | Rate, pickup and delivery times, detention terms, payment terms | What the freight is, how much, who ships it, who gets it |
| Who signs | You (and the broker) before you take the load | Shipper, driver and receiver at the docks |
| When | Before you go | At pickup and at delivery |
| What it proves | The deal you agreed to | What you picked up and what you delivered |
Both go in your invoice packet. A mismatch between them, like a different weight or a different address, is better caught at the dock than after you are paid. Run the rate con through the Rate Confirmation Checker before you roll, and read our rate confirmation checklist.
What is on a bill of lading
Under 49 CFR 373.101, a covered for-hire motor carrier must issue a receipt or bill of lading that has:
- The consignor (shipper) and consignee (receiver)
- The origin and destination points
- The number of packages
- A description of the freight
- The weight, volume or measurement, if that is used to set the rate
Source: https://www.ecfr.gov/current/title-49/section-373.101
The same section says the carrier keeps a record of this information as set in 49 CFR Part 379, and Part 379's schedule lists bills of lading at one year. Most real BOLs also show a BOL number, PO or reference numbers, seal and trailer numbers, and who pays freight charges. The sections above have the field-by-field detail, and the free BOL generator makes one when the shipper does not have a form.
Who signs
- Shipper: signs when the freight is released to you.
- Driver: you sign for what you accepted. Your signature says you took the freight as described, so read first.
- Receiver: signs at delivery. That signed copy is your proof of delivery (POD).
Before you leave the dock: a checklist
| Check | What to look for | If it is off |
|---|---|---|
| Names and addresses | Shipper, consignee, origin and destination match the rate con | Call the broker before you leave |
| Piece count | Count the pallets or pieces against the BOL | Fix the BOL, or write the real count |
| Weight | BOL weight against the scale ticket, if you scaled | Note the difference on the BOL |
| Seal number | Seal on the trailer matches the seal number written on the BOL | Do not leave until it is written or fixed |
| Load and count | If you could not count or see the load, say so on the BOL | Write what you could and could not verify |
| Reference numbers | PO or pickup number the receiver needs | Ask the shipper to add it |
| In and out times | Your arrival, dock and departure times | Ask them to write them; photograph if they will not |
| Signatures and copies | Shipper signed, your copy is legible | Take a clear photo of every page |
How the BOL ties to getting paid
Brokers pay against a packet. The usual packet is the invoice, the rate con and the signed BOL or POD. Our invoice guide and the freight invoice generator have a BOL number field so the broker can match them. A clean, signed BOL makes the match easy. A missing signature or an unwritten shortage can hold up your invoice. Many drivers scan it before they leave the receiver's lot.
How the BOL ties to detention
Detention is billed on the times you can prove. The signed BOL or POD with your in and out times is one of the best records. Our detention pay guide lists what to keep, and the detention pay calculator does the math.
Example only. Made-up numbers. You arrive at a receiver at 7:30. You get a door at 10:15 and the receiver signs you out at 11:45. Free time on the rate con is 2 hours and the rate is $50 an hour.
- Time on site: 4 hours 15 minutes = 4.25 hours
- Billable hours: 4.25 minus 2 = 2.25 hours
- Detention: 2.25 × $50 = $112.50
If the BOL has no out time and the receiver will not write one, you have only your own records. That is why the times on the BOL matter.
Common mistakes
- Signing a BOL with a count you did not verify and no note on it.
- Leaving without a legible copy.
- Not writing damage or shortage on the BOL before the receiver signs.
- Letting the BOL weight and the scale ticket disagree without a note.
Get your numbers on paper
Want your real cost per mile? Get the free cost-per-mile sheet.
Common questions
- Can I use R+L Carriers' bill of lading for a load on my own truck?
- Only if the shipment is moving with R+L. Their form ties into their pickup and tracking. For a load you're hauling yourself, use a standard straight bill of lading like the one our free generator makes.
- What is a bill of lading?
- It is the receipt for freight. Under 49 CFR 373.101, a covered for-hire motor carrier's bill of lading lists the shipper and receiver, origin and destination, number of packages, a description of the freight and the weight if it sets the rate.
- What is the difference between a BOL and a rate confirmation?
- The rate confirmation is the price and terms deal for the load. The BOL is the receipt for the freight at pickup and delivery. You need both for your invoice packet.
- Who signs the bill of lading?
- Usually the shipper at pickup, the driver, and the receiver at delivery. The receiver's signed copy serves as the proof of delivery.
- How long should I keep a bill of lading?
- The FMCSA records schedule in 49 CFR Part 379 lists bills of lading at one year. Check the rule and your own needs, and ask your accountant what to keep for taxes.
- Do I need a BOL for every load?
- Under 49 CFR 373.101, covered for-hire carriers have to issue a receipt or bill of lading for property they take. Check the rule for your type of operation.
- Why does the BOL matter for detention?
- It can carry your in and out times, signed by the facility. Brokers pay on what the paperwork supports, so those times help back up your invoice.
Sources
- 49 CFR 373.101, For-hire, non-exempt motor carrier bills of lading (eCFR)
- 49 CFR Part 379, Appendix A, Schedule of Records and Periods of Retention (eCFR)
- 49 U.S.C. 14706, Liability of carriers under receipts and bills of lading
- 49 U.S.C. 80103, Negotiable and nonnegotiable bills
- 49 CFR Part 172, Subpart C, Shipping Papers (eCFR)

Free, no signup
Know your number before you take the load
26 free calculators, no signup. Want your loads and numbers saved? Try Pro free for 14 days, no card.